1. Information revealing:

a. The licensed and forecast average operational loadings for the light rail vehicles in the morning peak hour from 8am-9am on the CSELR. (Licensed capacity 6,750 passengers per hour / operational loadings unknown, cabinet information or not calculated)

b. The number of buses to be replaced by the light rail vehicles in the morning peak hour from 8am-9am (220 – 180 from the South East and 40 from elsewhere)

c. The licensed and average operational capacities of those buses. (Licensed capacity 25,300 (Based on maximum licensed capacity of 220 x 115 passenger bendy buses) Operational loading 16,000 (TfNSW estimate), which they later claimed as incorrect.

2. Documents revealing the details of any traffic modelling undertaken for the CSELR project. In this respect I specifically seek information which is not subject to cabinet-in-confidence provisions, which contains any of the following information:

a. Cost/benefit analysis between light rail and electric buses. (Not undertaken)

b. Cost/benefit analysis between light rail and business-as-usual (e.g. our current buses) (Cabinet information – not released, or not completed)

c. Forecast likely average light rail journey time from Kingsford to the City and Randwick to the City. (Unknown – not released – cabinet information/commercially sensitive information, or not calculated)

The following information has so far been released (or refused access)

Documents may be accessed by clicking on the links:

1. Sydney CBD and South East Light Rail End State SCATISM Modelling Transport Modelling Assessment Released (Previously “Commercially Confidential”)

2. Strategic Plan – Options Identification Report (Booz & Co) Released (Previously “Cabinet Information”)

3. Strategic Plan – Integrated Transport and Land Use Milestone 5: Option Assessment (Booz & Co)Access Refused (Cabinet Information)

4. Strategic Plan – Integrated Transport and Land Use Milestone 5: Options Assessment Volume II Appendices (Booz & Co) Access Refused (Cabinet Information)

5. Transport Operations Report (Booz & Co) Released – Public Information

6. Strategic Plan – Transport Network Context (Trevor Townson Consulting) Access Refused (Cabinet Information)

7. Rapid Economic Appraisal Addendum Report 2: Bus Comparator (PWC) Access Refused (Cabinet Information)

8. CBD Bus and Traffic Network Plan for Light Rail – Discussion Paper (TfNSW) Access Refused (Cabinet Information)

9. CBD Bus and Traffic Paramics Modelling (SKM) – Access Refused (Cabinet Information)

Supplementary Documents Found (With Links)

SD1 CSELR PTPM- Round 5.3 Model Specifications – Version 3- 26 May 2014 (Summary Table; Summary Chart 2021 NB; Summary Chart 2021 SB) Released.

SD2 Correspondence – Standing Advice on Bus Changes (Standing advice) Released.

SD3 Planning and Infrastructure questions on Traffic and Transport (21 March 2014) TfNSW responses (21 March 2014) (EIS evaluation) Released.

SD4 – “Business Case: Project Brief: CBD and South East Light Rail” or “Final Business Case” Access Refused (Cabinet Information)

SD5 – “Transport for NSW – CBD and South East Light Rail Detailed Economic Appraisal” or “PWC Final Report” Access Refused (Cabinet Information)

SD6 – “Transport for NSW – Sydney Light Rail Strategic Plan: Preliminary Economic Appraisal (Draft report V1.0)” or “PWC Draft Report” Access Refused (Cabinet Information)

SD7 – “Sydney CBD Bus and Traffic Paramics Modelling (Rev 2.0 Draft Final) (28 June 2012)” or “Draft SKM Report” Access Refused (Cabinet Information)

SD8 – “Sydney CBD Bus and Traffic Paramics Modelling – Stage 2 (Rev 2.0 Draft Final)” or “Draft SKM Stage 2 Report” Access Refused (Cabinet Information)

SD9 – “Sydney CBD Bus and Traffic Paramics Modelling – Independent Technical Review Stages 1 & 2 – prepared by GTA Consultants” or “GTA Final Report” Access Refused (Cabinet Information)

SD10 Sydney CBD Bus and Traffic Paramics Modelling – Traffic Modelling Summary Report – prepared by GTA Consultants (February 2014) (GTA Draft) Released.

SD11 SE Corridor Maps. Released.

SD12 – “Initial Light Rail Operations Simulation and Analysis – Interfleet Technology 26 April 2013” or “Interfleet Document” Access Refused (Cabinet Information)

An additional 47 documents have been found, but access has been refused to 28 of the documents under the grounds that they may “infringe the privilege of Parliament.

Table of Documents released or refused access 6th May 2019.

Documents released 6th May 2019.

Unfortunately, it appears that the travel times and loading capacity of the light rail (as distinct from the licensed capacity) have still not been provided.

An informal request for a release of the information has been lodged with Transport for NSW as of May 10th 2019.

It is still hoped that the NSW Premier, Gladys Berejiklian will release the travel times and operational loadings of the light rail, before or if it becomes operational.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s